OPERATOR’SMANUAL 22860Rev. 9/2001TP 100-7040-01-AT-FDwith Blower Setup InstructionsDouble & Triple Bag Grass Collection SystemsDouble Bag Collecti
8Figure 11. Install Bearing & EyeboltA. 7/16” x 1-1/2” Capscrew (4) E. 1/4” WasherB. Bearing F. 1/4” x 1” EyeboltC. 7/16” Nylon Lock Nut (4)
9Figure 14. Install Blower & Belt GuardInstall Blower & Belt Guard1. Install the blower onto the chute mount tabs with theblower mount tabs
10Initial Installation & AssemblyRemove Discharge Chute1. Park machine on a flat, level surface and apply theparking brake.2. Remove the discharge
11Install Spindle Pulley1. Apply an anti-seize compound to the spindle shaft.Install the new, double spindle pulley (C, Figure 22)on the shaft with th
1261” Blower Mount & Drive InstallationBlower Preparation1. Remove the belt guard (A, Figure 24) and hardware(B & C) from the blower housing a
13Figure 26. Install Bearing & SpringA. 7/16-14 x 1-1/2” Bolt E. 5/16-18 Flange NutB. Bearing F. 5/16-18 Nylon Lock NutC. 7/16-14 Nylon Lock N
14Figure 28. Install Blower BraceA. Blower BraceB. 3/8-16 x 1” BoltC. 3/8” WasherFigure 29. Install Blower Pulley & Guide Bolt11. Loosely inst
15Figure 31. Install BlowerA. 3/8-16 x 1” Bolt D. 3/8-16 Flange NutB. Mount Bar E. 3/8-16 x 1” BoltC. 3/8-16 X 1” BoltFigure 32. Install Belt Shi
16Discharge Chute ReattachmentMOWING WITHOUT THE BLOWERFor operation without the blower, the deflector must beproperly installed in the down position
Torque Specification ChartFOR STANDARD MACHINE HARDWARE (Tolerance ± 20%)HardwareGradeSAE Grade 2 SAE Grade 5 SAE Grade 8Size Ofin/lbs in/lbsin/lbsHa
Ferris Industries5375 North Main StreetMunnsville, NY 13409800-933-6175www.ferrisindustries.com© Copyright 2001 Ferris IndustriesAll Rights Reserved.
1IINNIITTIIAALL IINNSSTTAALLLLAATTIIOONN && AASSSSEEMMBBLLYY6611”” TTRRIIPPLLEE BBAAGG CCOOLLLLEECCTTIIOONN SSYYSSTTEEMMBBLLOOWWEERR MMOOUUNNT
2Read and obey all operation and warning decals.DANGER ROTATING CUTTING BLADE Do not operate mower without deflector or entire grass
3BEFORE OPERATIONClear the lawn of all sticks, stones, wire and other debriswhich may be caught or thrown by the mower blades.Check grass condition. I
4Initial Installation & AssemblyRemove Discharge Chute1. Park machine on a flat, level surface and apply theparking brake.2. Remove the discharge
5Install Spindle Pulley1. Apply an anti-seize compound to the spindle shaft.Install the new, double spindle pulley (C, FIgure 4)on the shaft with the
62. While holding the mount plate vertical and againstthe chute mount tabs, place the spacers on themower deck in the recesses of the mount plate.Make
7Blower Preparation1. Remove the belt guard (A, Figure 9) and hardware(B & C) from the blower housing and set aside.NOTE: Record the model and se
Commenti su questo manuale